Installation Without Opening Panels. Your business never stops.
The sensor clips onto the cable and draws its power from it. Hotel guests, factory production and mall visitors notice nothing.
- 1The sensor clips onto the cableNo power cut, no panel dismantling
- 2Data flows automaticallyNo extra wiring or infrastructure
- 3Consumption is visible from day oneThe whole facility on one screen
- 0
- Production loss
- 0
- Battery changes
- 0
- New wiring
How We Work: From Survey to First Report in 30 Days
One team, one point of contact. We run everything from installation to reporting.
Day 1
Site survey
Panels are inspected and measuring points chosen.
Week 1
Proposal & plan
Number of points, installation day and cost are agreed.
1–2 days
Installation
The team clamps on the sensors. No power cut.
Same day
Commissioning
The dashboard goes live and your team gets a short training.
First 30 days
Measurement period
A real consumption map of the facility emerges.
End of month 1
Savings report
Waste points and a prioritised action list.
Afterwards: remote monitoring
Monthly reports, instant alerts and remote updates. We don't need to come back on site.
No trace when you leave
Sensors clamp on, so they come off just as easily.
Installation Day: We Arrive in the Morning, Data Flows by Evening
While you're open, without disturbing anyone, in a single day.
Sample installation day
Mid-sized hotel · ~40 points- The team arrivesSafety and work-permit briefing, meeting your contact
- Main panelsSensors are clipped onto cables; the facility keeps running
- Floor, kitchen and plant panelsAll planned points are completed one by one
- Gateway installedData starts flowing to the dashboard
- TestingEvery measuring point is verified
- Handover & trainingDashboard walkthrough, then the team leaves
What it means for you
- Field teamExperienced electrical technicians
- Power cutNone. Guests and production are unaffected
- Construction / cablingNone. No walls, ceilings or ducts opened
- Same-day resultsFirst data on the dashboard by evening
Frequently asked questions
Do you need to cut the power for installation?
No. Sensors clip onto the cable; panels aren't dismantled and power isn't cut. Your business keeps running as normal during installation.
Do the sensors need battery changes?
No. Sensors draw their power from the cable they measure — no batteries and no new wiring.
How long does installation take?
Around 40 measuring points in a mid-sized hotel are completed in a single day. The first data appears on the dashboard the same evening.
Is our data secure?
Data is encrypted in transit and at rest. Access is managed per user, and you can export your data at any time.
What happens when the contract ends?
Because sensors clamp on, they come off just as easily — no trace is left in your facility.
Energy Monitoring Infrastructure Across Türkiye
Voltand makes energy consumption visible and manageable. Our team runs everything from installation to reporting.
voltand.com